• Home
  • About Lance
  • Sample Projects
Menu

Lance Richert - Architect

6240 127th Ave SE
Bellevue, WA. 98006
425-443-2188

Your Custom Text Here

Lance Richert - Architect

  • Home
  • About Lance
  • Sample Projects
    • Vuecrest Major Additions and Remodel
    • West Seattle Bungalow
    • Lance Richert Racing
    • Seattle 1941 Second Floor Addition
    • Somerset Second Floor Addition
    • Cabana in Sammamish
    • Tacoma New House Design
    • Major Addition with Mono Roof in Redmond
    • New Craftsman with DADU
    • Big Garage Addition in Maple Valley
    • Beaver Lake Open Floor Plan remodel
    • Office and Bedroom Addition - Sammamish
    • Eskil House - Bellevue
    • Great Room creation - Issaquah
    • Cabana Addition - Redmond
    • First Floor conversion to open concept - Beaver Lake
    • Bear Creek Mansion
    • North Bend 1920's House Lift and Addition
    • Redmond Rambler Additions And Renovations
    • 3 Season Room in Maple Valley
    • ADU, Office and Garage Addition - Bridle Trails
    • Great Room Creation in Sammamish
    • Redmond Rambler #2 Additions
    • North Seattle Addition
    • Redmond Rambler Great Room & Addition #3
    • Tam O'Shanter Addition
    • Bungalow Second Floor Addition - Seattle
    • Maple Valley Rambler Addition
    • Bare stud remodel in Renton
    • Big Shop - Woodinville
    • Rambler on Union Hill
    • Olsen Residence Addition and Renovations
    • Daugherty Residence Addition
    • New Rooms over Existing Garage
    • ADU over Garage - Ferndale
    • Hansen Residence
    • Torjehlm Residence Additions and Modernizations
    • Office Addition over Garage - Redmond
    • Daugherty Residence
    • Alfy Residence Addition and Renovations
    • Dobbs Mill Residence
    • Bridle Trails Remodel
    • PNW Music Promo Posters A-D
    • PNW Music Promo Posters E-K
    • PNW Music Promo Posters L-P
    • PNW Music Promo Posters Q-Z
New Rambler nearing completion.

Rambler on Union Hill

New single story house. We took the floor plan from the house the couple lived in for many years (but sold 6 years ago) and on this site, tweaked the floor plan for a new house on a larger lot but less then 300 yards from their old house. Pulled and stretched the old floor plan, added a nice covered cabana on the back, redesigned the roof over the Family Room and flipped the location of the Master Bath and Office areas. This couple's kids are grown and out of the house, we widened doors and hallways for future mobility needs as they plan to stay here into retirement for as long as possible.

Rambler on Union Hill

New single story house. We took the floor plan from the house the couple lived in for many years (but sold 6 years ago) and on this site, tweaked the floor plan for a new house on a larger lot but less then 300 yards from their old house. Pulled and stretched the old floor plan, added a nice covered cabana on the back, redesigned the roof over the Family Room and flipped the location of the Master Bath and Office areas. This couple's kids are grown and out of the house, we widened doors and hallways for future mobility needs as they plan to stay here into retirement for as long as possible.

New Rambler nearing completion.

New Rambler nearing completion.

Music room behind the garage will help isolate noise. Owner is a member of a Pink Floyd tribute band. Looking forward to visiting and listening to rehearsals.

Music room behind the garage will help isolate noise. Owner is a member of a Pink Floyd tribute band. Looking forward to visiting and listening to rehearsals.

Who doesn't like to watch concrete being poured. If it wasn't rainy and cold I could watch this for hours. Ha Ha. Here one guy controls the nozzle, the Coug with the trowel is finishing.

Who doesn't like to watch concrete being poured. If it wasn't rainy and cold I could watch this for hours. Ha Ha. Here one guy controls the nozzle, the Coug with the trowel is finishing.

Big boom to move the concrete. It took 4 loads just for the footings. They will let it set up for a week while they build the stem wall forms, then run a second pour for the stem walls. Then wood fram

Big boom to move the concrete. It took 4 loads just for the footings. They will let it set up for a week while they build the stem wall forms, then run a second pour for the stem walls. Then wood fram

After forms are pulled, framing can start.

After forms are pulled, framing can start.

TJIs ready to set out. Engineered wood products are smart products. Better use of wood, more stable with very little shrinkage.

TJIs ready to set out. Engineered wood products are smart products. Better use of wood, more stable with very little shrinkage.

These will get turned up vertical in a little bit, then plywood sub-floor laid down.

These will get turned up vertical in a little bit, then plywood sub-floor laid down.

Here the TJI floor joists will be hung from these metal hangers. This way they will have a flush floor between the garage and house.

Here the TJI floor joists will be hung from these metal hangers. This way they will have a flush floor between the garage and house.

Floors in, now the walls go up.

Floors in, now the walls go up.

Concrete pad is for the garage, pad to the right is for the music room.

Concrete pad is for the garage, pad to the right is for the music room.

Being framed on the ground, this is the North side tall wall yet to be lifted into place. It will lead to the covered deck.

Being framed on the ground, this is the North side tall wall yet to be lifted into place. It will lead to the covered deck.

Entryway being framed.

Entryway being framed.

No interior walls... yet.

No interior walls... yet.

They print the drawings half sized which can be easier to handle in the field. However the type is half the size. I've been increasing the size of my fonts due to how often drawings are printed at "ha

They print the drawings half sized which can be easier to handle in the field. However the type is half the size. I've been increasing the size of my fonts due to how often drawings are printed at "ha

Being a rambler means extra roof area, and extra trusses over a convenional 2-story house. There's another load of trusses that will come on a second truck. I've designed bigger houses, but not with a

Being a rambler means extra roof area, and extra trusses over a convenional 2-story house. There's another load of trusses that will come on a second truck. I've designed bigger houses, but not with a

Truss packages being lifted to the right areas.

Truss packages being lifted to the right areas.

Turning right and looking through the future kitchen. Guys are laying up scissor trusses over the Master Bedroom. Scissor trusses have a sloped bottom chord.

Turning right and looking through the future kitchen. Guys are laying up scissor trusses over the Master Bedroom. Scissor trusses have a sloped bottom chord.

More scissor trusses in the rehearsal room behind the garage.

More scissor trusses in the rehearsal room behind the garage.

Outdoor covered cabana will also be sloped rafters eventually.

Outdoor covered cabana will also be sloped rafters eventually.

Lots of Simpson bits in these modern houses.

Lots of Simpson bits in these modern houses.

Truss drawing is very accurate.

Truss drawing is very accurate.

Very cool "Attic" truss over the garage. Truss designer is able to "carve out" the middle portion of the webing to form an open area for storage. This an open area about 8-feet wide and 5-feet tall at

Very cool "Attic" truss over the garage. Truss designer is able to "carve out" the middle portion of the webing to form an open area for storage. This an open area about 8-feet wide and 5-feet tall at

Big beefy joint at the lower corner of the Attic truss. 2x4 bottom cord and the truss changes to 2x8 bottom cord at the "Attic" area span.

Big beefy joint at the lower corner of the Attic truss. 2x4 bottom cord and the truss changes to 2x8 bottom cord at the "Attic" area span.

View of the covered cabana from outside.

View of the covered cabana from outside.

IMG_0394.JPG
Siding and roofing on.

Siding and roofing on.

Rear cabana filling out nicely.

Rear cabana filling out nicely.

Front Entry taking shape.

Front Entry taking shape.

Main Living Room with future fireplace on the left.

Main Living Room with future fireplace on the left.

Looking through the great room to the kitchen area.

Looking through the great room to the kitchen area.

Grader taking a break. They've been laying the fill down in 6" lifts then compacting.

Grader taking a break. They've been laying the fill down in 6" lifts then compacting.

Outdoor attached cabana getting lights installed.

Outdoor attached cabana getting lights installed.

Some finish materials starting to go in, this is at the main entry.

Some finish materials starting to go in, this is at the main entry.

Great room taking shape. The trim around the windows took a guy a couple of days to cut and place.

Great room taking shape. The trim around the windows took a guy a couple of days to cut and place.

Landscaping starting to go in.

Landscaping starting to go in.

IMG_2253.JPG
Kitchen being built.

Kitchen being built.

You must select a collection to display.

Powered by Squarespace