• Home
  • About Lance
  • Sample Projects
Menu

Lance Richert - Architect

6240 127th Ave SE
Bellevue, WA. 98006
425-443-2188

Your Custom Text Here

Lance Richert - Architect

  • Home
  • About Lance
  • Sample Projects
    • Vuecrest Major Additions and Remodel
    • West Seattle Bungalow
    • Lance Richert Racing
    • Seattle 1941 Second Floor Addition
    • Somerset Second Floor Addition
    • Cabana in Sammamish
    • Tacoma New House Design
    • Major Addition with Mono Roof in Redmond
    • New Craftsman with DADU
    • Big Garage Addition in Maple Valley
    • Beaver Lake Open Floor Plan remodel
    • Office and Bedroom Addition - Sammamish
    • Eskil House - Bellevue
    • Great Room creation - Issaquah
    • Cabana Addition - Redmond
    • First Floor conversion to open concept - Beaver Lake
    • Bear Creek Mansion
    • North Bend 1920's House Lift and Addition
    • Redmond Rambler Additions And Renovations
    • 3 Season Room in Maple Valley
    • ADU, Office and Garage Addition - Bridle Trails
    • Great Room Creation in Sammamish
    • Redmond Rambler #2 Additions
    • North Seattle Addition
    • Redmond Rambler Great Room & Addition #3
    • Tam O'Shanter Addition
    • Bungalow Second Floor Addition - Seattle
    • Maple Valley Rambler Addition
    • Bare stud remodel in Renton
    • Big Shop - Woodinville
    • Rambler on Union Hill
    • Olsen Residence Addition and Renovations
    • Daugherty Residence Addition
    • New Rooms over Existing Garage
    • ADU over Garage - Ferndale
    • Hansen Residence
    • Torjehlm Residence Additions and Modernizations
    • Office Addition over Garage - Redmond
    • Daugherty Residence
    • Alfy Residence Addition and Renovations
    • Dobbs Mill Residence
    • Bridle Trails Remodel
    • PNW Music Promo Posters A-D
    • PNW Music Promo Posters E-K
    • PNW Music Promo Posters L-P
    • PNW Music Promo Posters Q-Z
Finished large dormer addition.

Bungalow Second Floor Addition - Seattle

Design to enlarge and modernize a second floor “loft” in a 40’s era house in Seattle. Work included reconfiguring an unsafe stairway access to the second floor to meet current code. Remove some walls on the main level, and seismic retrofit work in the basement.

Bungalow Second Floor Addition - Seattle

Design to enlarge and modernize a second floor “loft” in a 40’s era house in Seattle. Work included reconfiguring an unsafe stairway access to the second floor to meet current code. Remove some walls on the main level, and seismic retrofit work in the basement.

Finished large dormer addition.

Finished large dormer addition.

Blue is the enlargement area from the old dormer to a larger dormer.

Blue is the enlargement area from the old dormer to a larger dormer.

Back of house before work starts.

Back of house before work starts.

Original stairs to be replaced.

Original stairs to be replaced.

This area with the tight pie shape is really unsafe. New toddlers are in the house.

This area with the tight pie shape is really unsafe. New toddlers are in the house.

Old bath at dormer to be enlarged and remodeled.

Old bath at dormer to be enlarged and remodeled.

View of some of the original bones. 2x4 roof rafters.

View of some of the original bones. 2x4 roof rafters.

Demolition work starts and stairs meeting code are built.

Demolition work starts and stairs meeting code are built.

IMG_7014.JPG
Bathroom area of new dormer getting framed.

Bathroom area of new dormer getting framed.

New window added and furring out walls to get a thick layer of batt insulation.

New window added and furring out walls to get a thick layer of batt insulation.

Collar ties and a beam up there to support the new dormer.

Collar ties and a beam up there to support the new dormer.

More framing, and furring out the 2x4 rafters to take more insulation.

More framing, and furring out the 2x4 rafters to take more insulation.

The new stair had to snake between the existing kitchen and first floor bathroom which had fixtures in the walls that couldn't move.

The new stair had to snake between the existing kitchen and first floor bathroom which had fixtures in the walls that couldn't move.

Rebuilt stairs from above.

Rebuilt stairs from above.

New dormer taking shape on the outside.

New dormer taking shape on the outside.

New stairs are done.

New stairs are done.

Top of stairs leading to the refurbished second floor rooms.

Top of stairs leading to the refurbished second floor rooms.

On the first floor a few interior walls were removed to open up the main areas to flow nicely. New stairs upper right.

On the first floor a few interior walls were removed to open up the main areas to flow nicely. New stairs upper right.

The new bathroom on the second floor.

The new bathroom on the second floor.

Section cut. Careful measurements of the new stairs to confirm head height clearances, etc.

Section cut. Careful measurements of the new stairs to confirm head height clearances, etc.

You must select a collection to display.

Powered by Squarespace